Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 37 results ...

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Ackerman, P J, Jr. (2014) Condition assessment, indices, and risk-based decision-making for public school infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Albassami, A A (2014) A framework for international commercialization of innovative products in residential construction: A case of structural insulated panels (SIPs) in the United States and Saudi Arabia, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Charoenvisal, K (2013) A BIM interoperable web-based dss for vegetated roofing system selection, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, Q (2007) An object model framework for interface management in building information models, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Comu, S (2013) Examining the impact of facilitation on the performance of global project networks collaborating in virtual workspaces, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Jung, Y (2009) An approach to organizational intelligence management (a framework for analyzing organizational intelligence within the construction process), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, J S (1995) Reliability-based design of a retaining wall, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, W (1996) A systems approach to transportation infrastructure management: Development of a highway management system for the Virginia DOT, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lytle, A M (2011) A framework for object recognition in construction using building information modeling and high frame rate three-dimensional imaging, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Mitchell, Z W, Jr. (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Novak, V M (2012) Managing sustainability value in design: A systems approach, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Park, B (2002) Development of a virtual reality excavator simulator: A mathematical model of excavator digging and a calculation methodology, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pinero, J C (2003) A framework for monitoring performance-based road maintenance, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

  • Type: Thesis
  • Keywords: reliability; specifications; delivery method; government; monitoring; performance-based specification; safety
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305299354
  • Abstract:
    In the late 1980's and early 1990's few transportation agencies around the world considered performance-based specifications as an alternative to improve the efficiency of the services provided to the public. These initiatives are better known as Performance-Based Road Maintenance (PBRM). PBRM calls for performance-based work, in which a desired outcome is specified rather than a material or method. This type of specification promises to be an excellent tool to improve government efficiency in maintaining transportation networks; however, without proper monitoring, it could likely yield adverse outcomes. Since PBRM is relatively new, the availability of reliable and comprehensive sets of guidelines to evaluate the effectiveness and efficiency of this type of specifications in the roadway maintenance arena is limited. Transportation agencies currently rely on criteria and procedures they have had developed from their traditional methods used to evaluate performance. Unfortunately, some of these procedures cannot appropriately assess the benefits, if any, accrued by the government as a result of implementing performance-based specifications for the maintenance of the roadway system. This research presents the development of a framework for monitoring PBRM more comprehensively and accurately. The framework considers the assessment of five main areas—level of Service Effectiveness, Cost-Efficiency, Timeliness of Response, Safety Procedures, and Quality of Services—in order to guarantee the comprehensiveness and reliability of the evaluation process. The major contribution of this framework is to provide transportation agencies with guidelines for evaluating the effectiveness and efficiency of PBRM as an alternative delivery method to maintain and preserve the roadway system.

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Platt, R T (1998) Development of a ready-to-assemble construction system, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Prateapusanond, A (2004) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Sands, K S, II (2014) Ethics education and its relationship to undergraduate construction students' professional ethical sensitivity, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tucker, R R (2014) Influence of individual perceptions on engineering team performance within design-build infrastructure projects, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.